Project Overview
Design & Construct internal partitions

Client
Big Orange Pte Ltd

Site Specs
Gross Floor Area: c5,500m2
Net Lettable Area: c3,900m2
Number of units: c700+
Stages: Two

Processes handled by Steel Storage
Site analyses – by client (site found by SSA)
Facility design layout – by client
Construction budget – self storage partitions
Design and Construct – self storage partitions
Internal high partitioning
Gloss White hallway panelling

Special Features
High panels (3.5m) in parts of the building. Setting the partitioning standard for the clients’ regional expansion.
 
Learning Experience
Standard installation on Steel Storage’s part, but experience from the coordination in the overall project will be used for upcoming turnkey projects for the client.

1. THE OLD BUILDING

The facility with heavy cranes for handling heavy machinery. 

2. CONVERTING THE BUILDING
Stripping out the internal machinery and preparing for mezzanine area for storage. This will be for phase 2.
 
3. BUILDING WORKS
A bright and eye catching facility is very much part of Big Orange’s strategy. Steel Storage is able to match the exact colour requirements from outside to inside.
 
4. INTERNAL STORAGE STEEL PARTITIONS
Part of the facility has higher panels to maximise the customers usable space. Some units will have a 'show unit' feel as they will be visible from the outside.
 
5. STAGE ONE COMPLETE
The finished facility. Second stage to come!

The old building 
 
Converting the building 
 
Building Works 
 
Building Works 
 
Internal Partitioning 
 
Internal Partitioning 
 
 
Stage 1 complete